Monday, May 2, 2011

R E S U M E

R E S U M E

Risa Prominda, STA, M.Arch

Email : rprominda@yahoo.com

rprominda@gmail.com

Website: http://prominda.webs.com

http://promindaportfolio.blogspot.com



RESUME

Risa Prominda
· Male · Indonesian. age 35

WORK EXPERIENCES

  • February 2011 - present
    DPA Architects, Singapore
    Position : Architecture Coordinator

    http://www.dpa.com.sg
  • june 2008 - february 2011
    Airmas Asri Architects, Indonesia
    Position : Architect in Charge

    http://www.airmasasri.com
    Responsibilities:
    Design Architect : Mainly working on concept design to get project proposal approved. then maintain design concept througout Schematic and Design Development phase. While Construction Drawings done by other set of team.

    Projects:
    • Menteng Mansion
    • Bintan Villa
    • Bintan Condotel

  • 2007-2008
    Freelance


  • March 2004 -2007
    Paramita Abirama Isthasadhya (PAI), Kemang-Jakarta-Indonesia
    Position : Acting Project Architect

    http://www.pai-design.com
    Responsibilities:
    Act. Project Architect :Drawing Coordination, Consultants Coordination, Site Supervision
    Projects :
    • Residence at Permata Hijau, Permata Hijau – Act. Project Architect
    • Residence at Taman Golf Timur, Pantai Indah Kapuk – Assisting from Concept to Schematic phase
    • CityWalk, Karet – Public Space Design : Restrooms,
      Basement Entrance


  • March 2001-March 2003
    Niles Bolton Associates, Alexandria-Virginia, US
    Position : Intern Architect
    http://www.nilesbolton.com
    Responsibilities:
    • Architectural Design especially Elevation concept.
      Construction Documentation Sets which includes Floorplan, Layout, Details, Elevation Details,
    • checking ADA, local and national Building codes against design layout, As-built set.
    • Working on 3d model, presentation drawings and autocad drafting tasks.
    • Layout and Image editing for an Architectural Design Guidelines for a beach resort project.

    Projects :

    • JPI at Congressional Village, Maryland – Multi-story family housing (Apartment), US
    • JPI at College Park, Maryland - Multi-story family housing (Apartment), US
    • JPI at Jefferson Station, Virginia, US

  • September 2000-December 2000
    Anshen + Allen Architects, San Francisco, US
    Position : Intern Architect
    http://www.anshen.com

    Responsibilities:
    Working on 3d presentation drawings and autocad drafting tasks.
    Projects:
    • Kaiser Permanente hospital,, Santa Barbara,California, US
  • 1999
    Savannah College of Art and Design Information Technology Office
    Part Time Job Web page Designer
    Responsibilities:
    Tutoring Proffesors and staffs on how to use some assigned computer softwares.
    Creating webpages
  • 1996-1997
    BIRANO Architecture Design Firm-Bandung,Indonesia
    3 Months Internship


    EDUCATION

    • Master of Architecture (M.ARCH) 1998-spring 2000
      Savannah College of Art and Design (SCAD),
      Savannah-Georgia
      School of Building Art
      Architecture Department
      http://www.scad.edu


    • Bachelor of Architecture (B.Arch)1992-1997
      Parahyangan Catholic University, Bandung-Indonesia
      (UNPAR)
      Architecture Department
      http://www.unpar.ac.id


    SKILLS
    • Computer 3d modeling
    • Architecture Design
    • Architecture Presentation
    • Webpage Designer
    • Architectural Design Sketches
    • Computer Architecture Animation

    THESIS

Graduate :
"Savannah Urban Waterfront Regeneration"
A thesis project which utilized the elements of Urban Regeneration into an architectural project, which was considered as a catalisator for Urban Renewal in historic downtown Savannah, Georgia. The project explores all design element that may integrate with city's grid to enhance the connection between Catalisator and the entiry Urban structure

Undergraduate :
"Review on Urban Regeneration Proccess of Kampung Beting, Pontianak Urban Revitalization"
A review on how the Urban Regeneration proccess is being actualized in one of the most historical site in Pontianak which has been abandoned, many factors which determinded the success of Regeneration process being reviewed, and the result of the review was there is need to be a political will of local government to be involved in the process and putting the plan to work effectively and immediately

2 comments: